Maphar Co.Ltd.

Project description
The plant was built to produce additives for metallurgical industries.The processing of raw material causes tremendous thermal loads in the production halls.
Requirements
Due to the intense heat loads related to the high energy input required for the production of metallurgical products a careful planning, sizing and implementing of the Natural Ventilation system was essentially necessary.
Solution
AEROVENT Middle East W.L.L. implemented the principle of Natural Ventilation. Ridge and slope ventilators Type AEROTOP-I were selected as exhaust air components. They are permanently open and absolutely weather-proof. These system components ensure a permanent aeration of the production building.
Project duration
AEROVENT Middle East W.L.L. was involved in the early project phase. The planning, the co-ordination, the fabrication, the supply and the erection work were performed according to the general project time schedule in co-operation with other companies involved in the project.
Specialities
Due to the close and constructive co-operation with the plant designer, the general contractor, the client and the partners it was possible to complete the project in time.